Firelands Regional Medical Center
Sandusky, Ohio, USA
200,000 ft² | 18,580 m²
This internal move took place over seven days and concluded with the patient transfer of 30 patients into the new Inpatient tower.
Sandusky, Ohio, USA
200,000 ft² | 18,580 m²
This internal move took place over seven days and concluded with the patient transfer of 30 patients into the new Inpatient tower.
Paris Island, South Carolina, United States
80,000 ft² | 7,430 m²
HCR conducted meetings with hospital managers and staff to plan the move in advance of actual physical relocation, toured the site to determine logistics, and prepared an advanced move schedule / sequence. This 2 phased move took place over four days and included…
Brampton, Ontario, Canada
1,300,000 ft² | 120,775 m²
For two years, HCR planned for the relocation of the entire Peel Memorial site (including other outbuildings) to the new facility that was located 20 minutes away. HCR’s work not only included the coordination and onsite receiving, unpackaging, assembly and placement of the Owner Purchased Owner…
Middletown, Ohio, USA
750,000 ft² | 69,675 m²
This move involved relocating the main legacy hospital and an outbuilding into the new hospital and three outbuildings. It took place over 14 days and included advanced planning, scheduling, physical relocation and the consolidation of redundant hospital items. HCR also provided consultation services and verified disconnects…
Homestead, Florida, USA
375,000 ft² | 34,840 m²
HCR provided consultation services to the Baptist Health transition team to plan and develop an efficient move schedule that supported the relocation of both patients and assets to the new site about 10 miles away. The 10 day relocation was successful as all settled into their…
Waterville, New Brunswick, Canada
300,000 ft² | 27,870 m²
HCR prepared for this logistically challenging move by providing detailed scheduling and advanced planning. The move involved the relocation of two facilities (each located 25 kilometers away) into a brand new hospital located in between both legacy sites. HCR provided high-tech hospital equipment verifications and…
Washington, District of Columbia, USA
150,000 ft² | 13,935 m²
This relocation involved advanced planning, scheduling, and the physical relocation of the Infants and Childrens’ Inpatient units. Items were relocated from other offsite locations to the new facility. HCR assisted with the relocation of patient belongings and critical care items during the patient…
Kalamazoo, Michigan, USA
750,000 ft² | 69,675 m²
Through departmental meetings, the development of a detailed move calendar and various other move related information, HCR completed a 4 day move to the new facility. HCR consulted with Bronson Health Care Group to develop the patient move schedule, move routes and a security command structure…
Reading, Pennsylvania, USA
426,000 ft² | 39,575 m²
HCR planned for the relocation of the entire existing site into the brand new 426,000 square feet replacement facility. Our worked involved the sequencing, verification of transferable equipment, physical relocations, wall hung installations, and patient move planning and relocation assistance.
Brockville, Ontario, Canada
160,000 ft² | 14,865 m²
This relocation involved the resettlement of the existing retirement residence including 224 residents and their belongings into the new 160,000 square foot facility. Through advance department meetings, HCR completed the planning, scheduling and relocation of each department and their residents.