Toronto, Ontario, Canada

180,000 ft² | 16,720 m² 

 

The new chronic continuing care facility was built on the same site as the old building and more than doubled the existing patient population.  Planning began about a year in advance and the move was executed in a safe and timely manner with a minimum amount of risk and inconvenience.  HCR  erected a temporary covered link to protect all 92 patients during their relocation between buildings. At the conclusion of the move,  HCR helped consolidate all redundant items.

https://www.runnymedehc.ca/front-content