Toronto, Ontario, Canada
This internal office move required HCR to relocate over 160 offices and work station contents from the 8th floor to the 10th floor of the Hydro Building in downtown Toronto and occurred over several days. The building had strict rules regarding the use of their elevators which was factored into HCR’s planning. The HCR team worked diligently through the night and got 95% of everything up to the new floor by 6:00 am. This allowed for a quick transition into the new space.
For two days following the move, HCR kept a crew on site to assist with setting up the new space, hanging items in offices, re-arranging furniture, installing keyboard trays, setting up and loading the storage room shelving and moving several items to offsite areas.