Bellevue, Ohio, USA

130,000 ft² | 12,075 m²

 

HCR planned and sequenced in advance of the relocation from the existing site into the new replacement facility.  Prior to performing the relocations, HCR verified all the transferable equipment and performed the installations.  Our planning witnessed the successful transfer of the small patient population of 30 patients.

http://www.bellevuehospital.com/